EISCAT 3D design study
Up one levelDeliverables and other public documents (newest at the end)
-
Introduction and background
- Evolving general intoduction including some points from the developing study.
-
SAC Report October 2003
- The following report, summarising the science drivers for a new phased array radar, was written by the SAC in October 2003 and presented to the November 2003 meeting of EISCAT Council.
-
National Inputs
- Several EISCAT countries submitted co-ordinated inputs summarising their science priorities and how these affected the proposed options for system development. These inputs can be found in this folder. (Note that the UK input was incorporated directly into the document).
-
The next generation ISR system.
- "EISCAT_3D" - the next generation European Incoherent SCATter radar system
-
Deliverable D2.1 (WP2)
- EISCAT_3D Radar Performance Specification Document. Ver 1.1 November 7, 2005
-
WP5 Report
- Considerations and requirements regarding WP5:Interferometry, September 10, 2005
-
Deliverable D8.1 (WP8)
- Interim report on progress in Design Study Work Package 8 (EISCAT 3-D Data System) submitted February 3rd 2006.
-
WP8 Report - February 3 2006
- Progress report on Work Package 8 of the EISCAT-3D Design Study, submitted February 3rd 2006.
-
Deliverable D10.1 (WP10)
- WP10: New techniques, D10.1 Progress Report, 19 March 2006
-
WP5 Report
- Fundamentals of radar interferometry I:One baseline Stage 2 report, April 2006
-
Deliverable D1.1 (WP1)
- 1st Annual Report of the EISCAT_3D Design Study. Period: 2005-05-01 - 2006-04-30
-
1st Activity Report
- 1st Activity Report of the EISCAT_3D Design Study. Period: 2005-05-01 - 2006-04-30
-
WP5 Report
- Report on Synchronisation for interferometry, September 2006
-
Deliverable D5.1 (WP5)
- EISCAT_3D Radar Imaging Arrays Configurations Report, submitted September 27, 2006
-
Documents from SAC71
- The enclosed documents contain a number of questions submitted to the 71st SAC meeting in Uppsala, mostly relating to WP8. Since SAC did not really have time to discuss these documents, they are being made avaialble through the public part of the website to allow all of the user community to comment on them.
-
Deliverable 8.2 (WP8)
- Second deliverable from Work Package 8, relating to the design of the data archiving and distribution system.
-
WP5 Report
- Radar Interferometer Phase Calibration using the Visibility function of Incoherent Scattering Report, May 2, 2007
-
Deliverable D10.2 (WP10) 1:2
- WP10: New techniques, D10.2 Second Progress Report (Part1): Feasibility Study Report: Use of Long Time Series ISR Data for Improving Ionospheric Correction Models at High-Latitudes, submitted 2007-04-27
-
Deliverable D10.2 (WP10) 2:2
- WP10: New techniques, D10.2 Second Progress Report (Part2): First results of an open-source based program for acquiring long time series of ionospheric parameters from the EISCAT Madrigal database, submitted 2007-04-27
-
Deliverable D3.1 DRAFT (WP3)
- Draft of WP3's D3.2: EISCAT_3D Radar Active Element Subsystem Report - Options for the Active Element, 2007-05-25
-
Deliverable D1:2 (WP1)
- 2nd Annual Report of the EISCAT_3D Design Study. Period: 2006-05-01 - 2007-04-30, published 2007-06-12
-
2nd Activity Report
- 2nd Activity Report of the EISCAT_3D Design Study. Period: 2006-05-01 - 2007-04-30, published 2007-06-12
-
EISCAT_3D Mid-term Review Presentations
- The EISCAT_3D Mid-term Review was held August 28, 2007 at the Swedish Institute of Space Physics (IRF), Kiruna. The Presentations have now been compiled into one pdf. Published 2007-10-23
-
Deliverable D5:2 (WP5)
- Radar Imaging Algorithms Report, submitted January 30, 2008
-
Deliverable D1:3 (WP1)
- 3rd Annual Report of the EISCAT_3D Design Study. Period: 2007-05-01 - 2008-04-30, published 2008-06-10
-
3rd Activity Report
- 3rd Activity Report of the EISCAT_3D Design Study. Period: 2007-05-01 - 2008-04-30, published 2008-06-10
-
Deliverable 8.3 (WP8)
- Third deliverable from WP8, 10th September 2008.
-
WP5 Report
- Final Radar Imaging Algorithms Report, submitted August, 2008
-
Deliverable D12.1 (WP12) (18-Dec-2008)
- Time, Frequency and Synchronisation Subsystem Report
-
Notes from the 2nd EISCAT_3D All-Hands Meeting
- Notes from the second All-Hands Meeting held at IRF-Kiruna, Sept. 16-17, 2008
-
EISCAT_3D Antenna and Array - M.Sc. work
- M.Sc. work - Toralf Renkwitz Analysis and Optimisation of Medium Gain X-Yagi Antennas for the EISCAT 3D 237.5MHz Incoherent Scatter Radar Active Array
-
A Matlab Package for Phased Array Beam Shape Inspection
-
EISCAT_3D Annex I
- Annex I, Description Of Work, 1 May 2008 revision
-
Deliverable 8.5
- The fifth deliverable from WP8, describing the required interfaces to the data and archive system.
-
D6.1 Interim Report
- A report on WP6 progress as of Feb. 1, 2009
-
D3.2 Options for the Active Element
-
D8.4: EISCAT-3D as a geophysical observatory
- The fourth deliverable from WP8, looking at supporting instruments for EISCAT-3D and the effect of their data on the design of the archive systems.
-
D5.3: WP5 Data Visualisation
- Deliverable D5.3: EISCAT_3D Radar Multidimensional Imaging Radar Data Visualisation Report, Published 2009-03-12
-
D7.1: WP7 Basic set of software primitives for Demonstrator
- Deliverable D7.1: Basic set of control and monitoring software primitives for the WP4 demonstrator, published 2009-03-12
-
D7.2: WP7 Control and Monitoring Subsystem Report
- Deliverable D7.1: EISCAT_3D Radar Control and Monitoring Subsystem Report, published 2009-03-15
-
Deliverable 12.2
- Final report of D12.2
-
Deliverable 13.4
- Final deliverable 13.4
-
Deliverable 13.1: WP13 Additional input material related to the preparation of D1.5/D11.1
- Deliverable 13.1, published 2009-4-16
-
Deliverable 13.3: WP13 Review of steps to procure use of potential sites
- Deliverable 13.3, published 2009-4-16
-
Deliverable 9.1: WP9 Basic set of processing primitives for operation of Demonstrator
- Deliverable 9.1, published 2009-04-17, revised 2009-05-29
-
Deliverable D10.6: How EISCAT_3D can contribute to studies on Global Change
- WP10 Report published 2009-05-02
-
D 9.3 Polarisation Estimation using Eigenspace Analysis
-
D 9.5 Polarisation Estimation using Subspace Tracking
-
D 9.4 The Reference Prior for Complex Covariance Matrices with Efficient Implementation Strategies
-
WP5 Final Report
- Final report on WP5 by Cesar La Hoz, May 8 2009.
-
WP10 Final Report
- Final report on WP10 by Cesar La Hoz, May 1 2009.
-
D6.2 ACTIVE ELEMENT SUBSYSTEM DESIGN
- EISCAT_3D DELIVERABLE 6.2: ACTIVE ELEMENT SUBSYSTEM DESIGN
-
Deliverable 13.5
- Frequency allocations - status report
-
Deliverable 8.6: Visualisation for EISCAT_3D
- Report on visualisation techniques for EISCAT_3D, prepared by Bjorn Gustavsson, UiT.
-
Deliverable D4.2: EISCAT_3D receiver/antenna subsystem report
- EISCAT_3D receiver/antenna subsystem report (Lulea Technical University).
-
Uppsala User Meeting: May 28-29 2009
- Summary and presentations from the Uppsala users meeting in May 2009.
-
D9.2 Signal Processing Subsystem Report
- Final deliverable from WP9, Signal Processing Subsystem Report. Published 2009-06-05
-
Deliverable D11.1 Final Design Study Report
- This report summarises the results from the four-year “EISCAT_3D Design Study”, a project supported by the Sixth Framework Programme of the European Union and running from May 1, 2005 to April 30, 2009.
-
Deliverable D1.4 (WP1)
- 4th Annual Report of the EISCAT_3D Design Study. Period: 2008-05-01 - 2009-04-30, published 2009-06-16
-
4th Activity Report
- 4th Activity Report of the EISCAT_3D Design Study. Period: 2008-05-01 - 2009-04-30, published 2009-06-16
-
Deliverable D1.5 (WP1)
- The final management report of the project. Published 2009-06-16
-
Final Report - Activity Report EU-style
- A publishable final activity report, cumulating and summarising the project activities and results over the full duration. Published 2009-07-20
-
Final Report - Financial Information - Appendix 4 Summary Financial Report
- A Final summary financial report consolidating the costs of all the contractors taking into account any adjustments made by the Commission, in an aggregate form covering the entire duration of the project. Published 2009-07-20
-
Final Report - Financial Information - Appendix 5 Human Effort
- A table of the human effort per partner and task along the entire duration of the project provided as a separate document. Published 2009-07-20
![[Finnish Intro]](index_html_files/image003.gif)
![[French Intro]](index_html_files/image004.gif)
![[German Intro]](index_html_files/image005.gif)
![[Japanese Intro]](index_html_files/image007.jpg)
![[Norwegian Intro]](index_html_files/image008.gif)
![[Swedish Intro]](index_html_files/image009.gif)
![[United Kingdom Intro]](index_html_files/image010.gif)
![[Chinese Intro]](index_html_files/chinese_flag_small.gif)